Building at Speed: 350Mbps Connectivity for London's Biggest Sites
McGee Construction needed fast upload speeds for site managers. Integra delivered 350Mbps+ download and 100Mbps+ upload. Deployed in days.
Company
McGee Construction
Industry
Specialist Engineering Contractor
Location
London

Description
McGee Construction, a leading specialist engineering contractor based in London, has excelled in innovative engineering solutions since 1959, tackling complex challenges across the capital.
The Problem: Waiting Months for Connectivity You Need Today
McGee Construction manages some of London's toughest builds. Sites are often underground, temporary, or located where infrastructure doesn't exist yet.
Traditional leased lines take 12 weeks to install and cost a fortune. Project managers can't wait that long. They need to upload large files instantly, communicate with teams in real time, and move rigs if the site changes. Slow internet doesn't just annoy them—it costs them money.
What They Needed: Fast Upload, Instant Deployment, Reliable Everywhere
McGee's team needs to push 50GB files from site to HQ instantly. Architectural plans, progress photos, equipment specs—all moving throughout the day. Download speed matters. But upload speed wins jobs.
They needed connectivity installed in a week, not three months. And it needed to work whether they were at Battersea Power Station, under the Thames, or in a basement in the City.
"We got live connectivity in a week. No months of waiting, no huge installation bills. And the upload speeds are massive—our project managers can work like they're in the office. That's what makes Integra different."
Chris Pyne, Head of IT, McGee Construction
The Solution: Multi 4G/5G Bonded Over SD-WAN
Integra bonded multiple 4G/5G connections together over SD-WAN. Result: 350Mbps+ download and 100Mbps+ upload. Where there are multi 5G connections available, they unlock even higher speeds.
Installation took a week. WiFi networks went live across site. Project managers could upload files in minutes instead of hours. And if the site moved? The hardware moved with it.
No waiting for BT. No six-figure bills. No infrastructure that becomes stranded when the project ends. Just connectivity that works where and when they need it.
Solutions Delivered
More Stories
Explore Other Case Studies

Royle Farm Business Park
From Farm to Fibre: Royle Farm Business Park
Read Story
WRSA Steam Rally Festival
Steam at Scale: 500Mbps for 8,000 Visitors
Read Story
WB Power Services
Dodging the £50K Bill: SD-WAN at Chorley Depot
Read Story
Little Quarry Glamping
Luxury Pods, Real Internet: Little Quarry's Breakthrough
Read Story
Carbee Ltd
From 0.1Mbps to 300+: Rural Car Dealer Gets High-Speed
Read Story
Royal Harwich Yacht Club
Full Sail: 300Mbps in the Middle of Nowhere
Read Story
UKHarvest
Food Rescue Needs Fast Internet: UKHarvest's Win
Read Story
Thinking Anglers
YouTube Creators Need Upload Speed: They Got It
Read Story
Atura Proteins
Plant Proteins Powered by Real Connectivity
Read Story
APJ European
A Warehouse in a Digital Blackspot: Solved
Read Story
Seacon Group